XDP Remanufactured AE Fuel Injector (Stock HP) XD475
In stock
SKU: XDP-XD475
- SKU
- XDP-XD475
Earn up to $ Cash Rewards
Please contact us for instructions on how to return your core.
The XDP Remanufactured AE Fuel Injector (Stock HP) XD475 will replace the damaged #8 Long Lead injector in your 1999.5-2003 Ford 7.3L Powerstroke. With years of manufacturing experience and over 30 million diesel fuel injectors produced to date, you can be sure you are getting a quality product.
By surpassing the manufacturers' current design specifications, these injectors have less than 0.2 percent warranty rate. Every injector is comprehensively tested for nozzle flow and needle lift as well as opening operation and leakage. Additional tests include shot-to-shot flow meters, poppet seat leakage test, and injection timing measurements for best-in-class testing.
Quality & Testing
Advanced end-of-line testing, delivery, leakage and opening characteristics.
Precision remanufacturing process ensures highest quality, reliability and performance.
Opening clearances are set to strict specifications; validated with engine & vehicle testing and compared to OE product.
Features:
- Stock HP & Flow Rating
- Advanced End-Of-Line Testing
- Nozzles Tested For Flow, Leakage & Needle Lift
- In-Line Error Proofing Incorporated In Assembly Process
Warranty
All product warranties if any, implied have been done so at the discretion of the manufacturer. If you need warranty assistance on any product you've purchased, please contact the manufacturer directly.
Products manufactured by XDP carry a 2-Year warranty against defects in materials and craftsmanship. The Warranty is Limited to two (2) years from the date of sale and limited solely to the parts contained within the product's kit. All products that are in question of Warranty must be returned shipping prepaid to XDP and must be accompanied by a dated proof of purchase receipt. Warranty is limited to the original purchaser.
Under no circumstances shall the Xtreme Diesel Performance, LLC. be liable for any labor charged or travel time incurred in diagnosis for defects, removal, or reinstallation of this product, or any other contingent expenses.
Vehicle Fitment
| YEAR | MAKE | MODEL | FOR ENGINE SERIES |
|---|---|---|---|
| 2000 | Ford | Excursion | 7.3 |
| 2001 | Ford | Excursion | 7.3 |
| 2002 | Ford | Excursion | 7.3 |
| 2003 | Ford | Excursion | 7.3 |
| 1999 | Ford | F-250 Super Duty | 7.3 |
| 2000 | Ford | F-250 Super Duty | 7.3 |
| 2001 | Ford | F-250 Super Duty | 7.3 |
| 2002 | Ford | F-250 Super Duty | 7.3 |
| 2003 | Ford | F-250 Super Duty | 7.3 |
| 1999 | Ford | F-350 Super Duty | 7.3 |
| 2000 | Ford | F-350 Super Duty | 7.3 |
| 2001 | Ford | F-350 Super Duty | 7.3 |
| 2002 | Ford | F-350 Super Duty | 7.3 |
| 2003 | Ford | F-350 Super Duty | 7.3 |
| 1999 | Ford | F-450 Super Duty | 7.3 |
| 2000 | Ford | F-450 Super Duty | 7.3 |
| 2001 | Ford | F-450 Super Duty | 7.3 |
| 2002 | Ford | F-450 Super Duty | 7.3 |
| 2003 | Ford | F-450 Super Duty | 7.3 |
| 1999 | Ford | F-550 Super Duty | 7.3 |
| 2000 | Ford | F-550 Super Duty | 7.3 |
| 2001 | Ford | F-550 Super Duty | 7.3 |
| 2002 | Ford | F-550 Super Duty | 7.3 |
| 2003 | Ford | F-550 Super Duty | 7.3 |
Factory replacement parts like the ones from XDP are a great option to upgrade and increase reliability. We have what you need from alternators, fuel plugs, and sump kits!
Login and Registration Form
This form is protected by reCAPTCHA - the Google Privacy Policy and Terms of Service apply.